The records include recorded violations parents may want to understand before enrolling. These are conversation starters, not a pass-or-fail judgment.
Next: Review the inspection history below and ask the provider what the records mean and what changed afterward.
Summary
This summary covers eight available inspections for Schertz 1st Baptist Preschool from September 16, 2021 through May 5, 2026.
Three inspections recorded violations, with six recorded violations in total.
The most recent higher-concern violation was on May 5, 2026 and involved equipment or readiness.
The available reports do not include a later inspection with no recorded violations after that violation.
At a glance
Total inspections
8
1 in last 12 months
Recorded violations
6
2 in last 12 months
Higher-concern violations
5
2 in last 12 months
Repeated topics
0
Last 36 months
Local comparison
8 total inspections vs 12.5 local median in 78154
Compared to 18 local facilities
Recorded violations per inspection
This provider
0.75
Local median
0.61
0.75This provider
0.61Local median
Inspections with higher-concern violations
This provider
38%
Local median
29%
38%This provider
29%Local median
Inspections with recorded violations
This provider
38%
Local median
38%
38%This provider
38%Local median
Repeated topics
This provider
0
Local average
0.72
0This provider
0.72Local average
Repeated topics
Topics that appeared in more than one inspection during the last 36 months. They may reveal a pattern worth examining.
No repeated topics found
The available reports do not show the same violation topic appearing in more than one inspection during the last 36 months. Review the inspection history below for any one-time violations or report details.
Inspection history
Available inspection history. Select a violation topic for more info.
The last documented fire drill was on February 10, 2022. The director stated that the fire drills are conducted monthly however were not documented. The operation was closed for the summer months June and July. This was corrected when a fire drill was conducted during the inspection and documented.
Correction status
Completed at time of inspection
More details
Official Texas risk level
Medium
Report section
746.5205(4) - Documentation of Drills
Official code
746.5205(4)
Higher concern: Staff training
Report finding
A caregiver received online CPR training which did not allow for hands on practice. The caregiver is scheduled to retake CPR training August 29th.
Correction deadline
September 1, 2022
Correction status
Correction evaluated August 29, 2022
More details
Official Texas risk level
Medium High
Report section
746.1315(b)(1) - CPR Training and Recertification Adhere to Guidelines-skill based