During inspection it was observed that 13 cribs had additional mats in the cirbs. One of the 13 cribs had two full size mats and a thin mat. One of 13 cribs had two full size mats in the cribs.
Correction deadline
November 7, 2025
Correction status
Correction evaluated November 19, 2025
More details
Official Texas risk level
Medium High
Report section
746.2409(a)(1) - Safety Requirements for Cribs - Snug Fitting, Firm, Flat Mattress Designed for Use in Crib
Official code
746.2409(a)(1)
Higher concern: Background screening
Report finding
Two caregiver's did not have a background check submitted. Note: One staff member was counted in ratio during walk through and left operation at 1:00 pm and other caregiver was not present during inspection. Background checks were submitted during inspection.
Correction deadline
November 9, 2025
Correction status
Correction evaluated November 7, 2025
More details
Official Texas risk level
High
Report section
745.641 - AP Background check results - Must receive notification prior to allowing subject to be present at your operation
746.4307 - Fenced Outdoor Activity Space -Exits Required
Official code
746.4307
Higher concern: Equipment or readiness
Report finding
There was one gate on the 18+ playground that did not close at the ground level creating an approximate 2 in gap. On the back playground where the fence material did not meet the shed, there was a large enough gap where children could exit the playground.
Correction deadline
July 12, 2024
Correction status
Correction evaluated July 23, 2024
More details
Official Texas risk level
High
Report section
746.4601(3) - Safety Requirements for Active Play Equipment - No Entrapment Openings